Before work starts
Late changes in a bathroom are costly, so decide the important things early.
- Layout: moving the shower, WC or basin means new pipework and drainage. Keeping the existing layout keeps the cost down.
- Ventilation and storage: plan them in from the start. A design choice should not cost you either.
- Choose tiles, fixtures and accessories before work begins. Buying ahead avoids delays, especially with imported products.
- Keep a contingency: older bathrooms can hide water damage or faulty pipes.
- Ask for itemised quotes and check that each covers everything you need.
Check approvals
In Dubai, plumbing or bathroom work, including new layouts, relocations and stack connections, appears on the list of works that need a permit, as does flooring where waterproofing is a concern. Plumbing or electrical work also needs DEWA approval. In an apartment, the building's management company needs to approve the works too. If you rent, you need the landlord's permission first.
Strip out and first fix
Once the old tiles and fittings are removed, the hidden services come first.
- Remove existing finishes back to a sound, clean surface.
- Run new supply and drain pipework, and set out the shower, WC and basin points.
- Install electrical conduits and boxes for lights, mirror and extract fan.
- Test the pipework before anything is covered. We check MEP work before walls and ceilings close.
Waterproofing and leak test
Tiles and grout are not a waterproof layer on their own. Waterproofing membranes and sealants go on before the tiles, and corners and joints need particular care.
- Check the base for excess moisture and remove old surface material, especially paint, before waterproofing.
- Apply the liquid membrane with its tape, collars and corner pieces, as the manufacturer specifies. Shower walls are waterproofed before tiling.
- Run a leak test before any final finishes: the drains are blocked and the floor is flooded and left for 24 to 48 hours.
- Fix any leak now. Once the tiles are on, the membrane cannot be inspected.
Ceiling, tiles and second fix
With the wet layer proven, the finishes follow in order.
- Plaster and level the walls, then fix the false ceiling with lighting and the fan opening planned in.
- Set the tiles out from one level line so joints run straight across walls and floor.
- Second fix: sanitary ware, taps, shower screen, switches and lights.
- Seal around fittings, then clean and test everything before handover.
How we handle a bathroom
Our own in-house team handles the plumbing, electrical work, tiling, false ceiling and fittings, so no stage is left between trades. It starts with a free site visit and a written quotation with the scope, a fixed price and a timeline.