Bathroom renovation checklist: plan it in the right order

Most bathroom problems, such as leaks, damp and cracked grout, start with a step done in the wrong order. Use this checklist to plan your bathroom before the first tile comes off.

By Javaid Ahmad Contracting

Before work starts

Late changes in a bathroom are costly, so decide the important things early.

  • Layout: moving the shower, WC or basin means new pipework and drainage. Keeping the existing layout keeps the cost down.
  • Ventilation and storage: plan them in from the start. A design choice should not cost you either.
  • Choose tiles, fixtures and accessories before work begins. Buying ahead avoids delays, especially with imported products.
  • Keep a contingency: older bathrooms can hide water damage or faulty pipes.
  • Ask for itemised quotes and check that each covers everything you need.

Check approvals

In Dubai, plumbing or bathroom work, including new layouts, relocations and stack connections, appears on the list of works that need a permit, as does flooring where waterproofing is a concern. Plumbing or electrical work also needs DEWA approval. In an apartment, the building's management company needs to approve the works too. If you rent, you need the landlord's permission first.

Strip out and first fix

Once the old tiles and fittings are removed, the hidden services come first.

  • Remove existing finishes back to a sound, clean surface.
  • Run new supply and drain pipework, and set out the shower, WC and basin points.
  • Install electrical conduits and boxes for lights, mirror and extract fan.
  • Test the pipework before anything is covered. We check MEP work before walls and ceilings close.

Waterproofing and leak test

Tiles and grout are not a waterproof layer on their own. Waterproofing membranes and sealants go on before the tiles, and corners and joints need particular care.

  • Check the base for excess moisture and remove old surface material, especially paint, before waterproofing.
  • Apply the liquid membrane with its tape, collars and corner pieces, as the manufacturer specifies. Shower walls are waterproofed before tiling.
  • Run a leak test before any final finishes: the drains are blocked and the floor is flooded and left for 24 to 48 hours.
  • Fix any leak now. Once the tiles are on, the membrane cannot be inspected.

Ceiling, tiles and second fix

With the wet layer proven, the finishes follow in order.

  • Plaster and level the walls, then fix the false ceiling with lighting and the fan opening planned in.
  • Set the tiles out from one level line so joints run straight across walls and floor.
  • Second fix: sanitary ware, taps, shower screen, switches and lights.
  • Seal around fittings, then clean and test everything before handover.

How we handle a bathroom

Our own in-house team handles the plumbing, electrical work, tiling, false ceiling and fittings, so no stage is left between trades. It starts with a free site visit and a written quotation with the scope, a fixed price and a timeline.

Common questions

Should a bathroom be waterproofed before tiling?

Yes. Guides advise making sure the contractor uses sealants and waterproofing membranes before laying the tiles, because tiles and grout alone do not stop water.

Source: propertyfinder.ae

How is a bathroom leak test done?

Before the final finishes, the drains are blocked, the floor is flooded to a set depth and left for 24 to 48 hours to reveal hidden leaks.

Source: propertyfinder.ae

Do I need a permit to move bathroom plumbing in Dubai?

Usually, yes. Plumbing or bathroom work, including new layouts, relocations and stack connections, appears on the list of works that need a permit in Dubai.

Source: propertyfinder.ae

What should I decide before the bathroom work starts?

The layout, tiles, fixtures and accessories, with ventilation and storage planned in. Late changes are costly, and imported products can take time to arrive.

Book your free site visit

Pick a service to start. It takes about a minute.

Pick a service

Sat–Thu, 8:00 am – 7:00 pm

Menu

Javaid Ahmad Contracting
Sat–Thu · 8:00 am – 7:00 pm+971 55 113 3635Book a free site visit

Book a free site visit

STEP 1 OF 3 · WHAT NEEDS DOING?

STEP 1 OF 3 · WHAT NEEDS DOING?

What needs doing?

Service
How much of the property? (optional)
STEP 2 OF 3 · WHERE AND WHEN?

Where and when?

Emirate
Property type (optional)

For example, Al Barsha

When would you like to start? (optional)
STEP 3 OF 3 · YOUR DETAILS

Your details

For example, 05X XXX XXXX

0 of 1000 characters