Tiles · Plumbing · Glass
Bathroom renovation in Dubai & the UAE
New tiles, fittings and pipework.
- Free site visit
- Written fixed quote
- Our own team

What's included in bathroom renovation
- Old tiles replaced with new wall and floor tiles
- Plumbing and sanitary ware
- Electrical work and false ceiling
- Glass screens around the shower
How we do bathroom renovation
Bathroom remodeling packs every trade into one small room. For bathroom renovation in Dubai, Javaid Ahmad Contracting does those trades in the right order, which is what keeps the finish sound.
After the free site visit you get a written quotation covering the strip-out, the fittings and the finishes, with a fixed price and a timeline.
Old tiles and fittings come out first. New supply and drainage pipework and electrical points go in and are tested before anything is closed up. Walls are plastered and levelled, and the false ceiling goes in with the lighting planned.
Tiles are set from a level line, then sanitary ware and glass shower screens are fitted. At handover we walk you through the room and leave it clean.
Read the guide: Bathroom Renovation Checklist: Plan It in the Right Order
Bathroom renovation from our projects
Bathroom renovation Bathroom tiling & glass screens Bathroom wall & floor tiles
Questions about bathroom renovation
Can I choose my own tiles and fittings?
Yes. We can install tiles and sanitary ware you have chosen, or recommend and source them. Your quotation shows which.
Do you replace the pipework or just the tiles?
Both, as needed. The engineer checks the existing plumbing at the site visit, and new supply and drainage pipework can be part of the scope.
Do you fit glass shower screens?
Yes. Glass screens around the shower are part of our bathroom work.
Can you renovate just one bathroom?
Yes. We take on a single bathroom as readily as a full renovation.
How much does a bathroom renovation cost?
It depends on the size of the bathroom, the scope and the materials. After the free site visit you receive a written quotation with the scope, a fixed price and a timeline, before any work starts.
How long does a bathroom renovation take?
It depends on the size and scope. Your written quotation sets out the scope, price and timeline, so you know what to expect before work starts.
Is the false ceiling and lighting part of the job?
Yes. Walls are plastered and levelled, and the false ceiling goes in with the lighting planned, before the tiles and fittings.
Book your free site visit
Pick a service to start. It takes about a minute.
Sat–Thu, 8:00 am – 7:00 pm


