Mechanical · Electrical · Plumbing
MEP contractor in Dubai & the UAE: electrical & plumbing
Tested before the walls close.
- Free site visit
- Written fixed quote
- Our own team

What's included in MEP works
- Water supply, drainage and sanitary fittings
- Sockets, switches and lighting points
- AC points and ducting coordinated with ceilings
- Coordinated with tiling and plaster
How we do MEP works
The work you never see once the walls close. As an MEP contractor in Dubai, Javaid Ahmad Contracting puts electrical and plumbing services in first and checks them before anything covers them.
An engineer reviews the existing services at the free site visit and plans where new points need to go. The written quotation lists the MEP scope with a fixed price and a timeline.
First fix comes before plaster and tiles: supply and drainage pipework, conduits and cables, socket and switch boxes, and AC points with ducting coordinated with the ceiling. Everything is checked before walls and ceilings close.
Second fix follows the finishes: sanitary fittings, switches, sockets and lights. Because one team does both the MEP and the finishes, the trades are coordinated in-house rather than handed between contractors.
Read the guide: Bathroom Renovation Checklist: Plan It in the Right Order
MEP works from our projects
Premium bedroom renovation Premium living room renovation Office renovation Salon renovation Ceiling tiles & panel lighting Kitchen cabinets Plumbing work
Questions about MEP works
Do you take on MEP work on its own?
Yes. MEP can be a job on its own or part of a wider renovation or fit-out.
Is the pipework and wiring checked before the walls close?
Yes. First-fix plumbing and electrical work is checked before plaster, tiles or ceilings cover it.
Can you add sockets or lighting points?
Yes. New sockets, switches and lighting points can be set out to suit your layout.
Do you handle AC points and ducting?
Yes. We install AC points and coordinate the ducting with the false ceiling, so grilles and access openings line up.
What is first fix and second fix?
First fix goes in before plaster and tiles: pipework, conduits and cables, socket and switch boxes, and AC points. Second fix follows the finishes: sanitary fittings, switches, sockets and lights.
Book your free site visit
Pick a service to start. It takes about a minute.
Sat–Thu, 8:00 am – 7:00 pm


