1. Check the trade licence yourself
Do not rely only on a PDF copy of a licence. Look the company up on the official register. The UAE government portal lists these channels:
- The National Economic Register (Ministry of Economy and Tourism), for business licences across the UAE.
- Dubai: the licence information search from Dubai Economy and Tourism (DET). Search by the English or Arabic name, or by the licence number.
- On a DET record, check the licence status, expiry date, legal type and licensed business activities.
- Abu Dhabi: the economic licence enquiry service. For the other emirates, start from the same u.ae page, which links each emirate's own services.
- Free zone companies: verify the licence with the relevant free zone authority. Meydan Free Zone, for example, runs its own registry.
2. Make sure the licence matches the work
The activities on the licence should cover what you are hiring the company to do: renovation, fit-out, MEP or finishing works. In Dubai, Law No. 7 of 2025 makes Dubai Municipality responsible for classifying contractors in construction, building and demolition, with a central contractor register linked to the Invest in Dubai platform. The same law bars contractors from exceeding their approved technical or financial capacity, or subcontracting without prior approval.
- Ask which authority the company is registered with for your type of work.
- Ask whether its own team does the work, or whether trades are subcontracted.
- Ask who supervises the site day to day, and who your single contact is.
3. Get a written quotation after a site visit
A price given over the phone cannot reflect the real condition of your walls, pipes and wiring. Ask for a site visit first, then a written quotation. Industry guides recommend comparing itemised quotes from at least three providers: a contractor can look cheaper only because the quote leaves some work out. Look for these in writing:
- Scope: every room and every trade, listed.
- Materials: which are included and which you supply.
- Price: what is fixed and what could change.
- Timeline: start date, main stages and handover.
- Approvals: who prepares the drawings and who submits them.
4. Ask about approvals before work starts
Many renovations need approval from the community and from the authority. In Dubai, guides advise getting a No Objection Certificate (NOC) from the owners' association or developer before filing with the regulator, and using contractors or consultants that are registered and licensed in Dubai.
- Structural changes, plumbing or bathroom reconfiguration, flooring where waterproofing matters, and electrical or AC alterations typically need a permit in Dubai.
- Repainting interior walls and swapping loose furniture usually do not, but confirm with your building management first.
How we work
Javaid Ahmad Contracting has worked across all seven emirates for over 20 years with an engineer-led, in-house team and no subcontractors. Every job starts with a free, no-obligation site visit, followed by a written quotation with the scope, a fixed price and a timeline. You deal with one point of contact from the visit to the handover walkthrough.



